At a glance
Welding a silo trailer tank after an accident is the most rigorous repair on the vehicle — it requires a welder certified to ISO 9606, a WPS approved for the trailer, certified filler materials, non-destructive testing (NDT) and an extraordinary TDT inspection. PHS Magnum welds AlMg 5083/5754 aluminium (TIG) and 304L/316L stainless steel, performs steel passivation and provides full documentation for the trailer file. Typical time including documentation: 4-7 working days depending on scope.
Silo trailer tank welding — a specialist repair
Welding a pressure vessel after an accident is the most rigorous repair on a silo trailer. It requires: a certified welder, a WPS approved for the trailer, certified filler materials, NDT by an external laboratory, and an extraordinary TDT inspection.
PHS Magnum has the complete competence package: welders certified to ISO 9606-2 (aluminium) and ISO 9606-1 (stainless steel), the tools, the materials, the documentation, and coordination with TDT.
Materials most frequently welded
The choice of filler material, method and testing depends on the tank material. A quick overview:
| Tank material | Typical brands | Filler wire | Method | NDT |
|---|---|---|---|---|
| Aluminium AlMg 5083 | Spitzer, Kässbohrer | ER5183 | TIG (141) | PT |
| Aluminium AlMg 5754 | Feldbinder EUT alu | ER5356 | TIG (141) | PT |
| Stainless steel 304L | Feldbinder EUT inox | ER308L | TIG / MIG | PT + passivation |
| Stainless steel 316L | Feldbinder premium | ER316L | TIG / MIG | PT + passivation |
| Structural steel S355 | frames, mountings | ER70S-6 | MIG/MAG (135) | MT |
Details of procedures and parameters for each material below.
Aluminium AlMg 5083 (Spitzer, Kassbohrer)
- AlMg alloy with Mn additive (3-4%)
- Tensile strength Rm: 290-345 MPa
- Welding wire: ER5183 (for 5083), ER5356 (universal AlMg)
- Gas: Argon 4.6 (99.996% purity)
- Method: TIG (141) with tungsten electrode
- Preheat: 100-150°C for thicknesses >6 mm
Aluminium AlMg 5754 (Feldbinder EUT aluminium)
- AlMg 3% alloy
- Tensile strength Rm: 220-275 MPa
- Wire: ER5356
- Method and procedures as for 5083
Stainless steel 304L (Feldbinder EUT inox)
- Composition: 18% Cr, 10% Ni, low carbon content
- Wire: ER308L (typically) or 308LSi
- Method: TIG (141) for 2-6 mm plates, MIG/MAG (135) for thicker
- Gas: pure argon or argon+H2 (TIG), argon+2% O2 (MIG)
- Passivation required after welding
Stainless steel 316L (Feldbinder EUT premium, chemicals)
- Additional molybdenum (2-3%) — resistance to pitting corrosion
- Wire: ER316L
- Procedures identical to 304L
Structural steel S355 (frame, mountings)
- Wire: ER70S-6 (low-carbon steel)
- Method: MIG/MAG (135)
- Gas: argon + 18% CO2
The WPS (Welding Procedure Specification)
Every welding repair on a pressure vessel is carried out in accordance with a WPS approved for the given trailer:
- Base materials (of the tank) and filler materials (wire)
- Welding method (TIG 141 / MIG-MAG 135)
- Parameters (current, voltage, travel speed)
- Shielding gas + flow rate (typically 8-15 L/min)
- Welding position (PA, PB, PC…)
- Preheating temperature
- Welding sequence (for long seams)
- Required NDT after the repair
A WPS is available for most Spitzer, Feldbinder and Kassbohrer trailer types — PHS Magnum coordinates with the manufacturer for non-standard configurations.
Non-destructive testing (NDT)
After every welding job on a pressure vessel — mandatory NDT.
MT (Magnetic Particle Testing)
For ferromagnetic steels. Sensitivity: cracks from 0.05 mm. Test duration: 30-60 min per weld.
PT (Penetrant Testing)
For stainless steel (paramagnetic) and aluminium. Duration: 60-90 min including penetrant drying.
RT (X-ray radiography)
The highest sensitivity, expensive and time-consuming. Used for:
- Welds after plate section replacement (highest responsibility)
- Welds inside the tank (hard to reach for MT/PT)
- Certain trailer types that require RT under the manufacturer’s documentation
Performed by external NDT laboratories. Time: 1-3 days from dispatch of samples to the report.
Passivation of stainless steel
After welding stainless steel (304L, 316L) we perform passivation — rebuilding the Cr2O3 passive layer destroyed by the high welding temperatures.
Procedure:
- Grinding the welds to Ra ≤ 0.8 µm
- Cleaning with isopropyl alcohol
- Passivation with nitric acid HNO3 20-50% (30-60 min reaction)
- Rinsing with demineralised water
- Drying with compressed air
- Passivation report for the trailer file
TDT inspection after welding
Welding a pressure vessel = an extraordinary TDT inspection is required.
Procedure:
- Notification to TDT (Katowice regional office)
- Inspector’s visit to the PHS Magnum hall
- Visual inspection of the welds after the repair
- Verification of documentation (WPS, welder’s certificate, NDT report)
- Hydrostatic pressure test (1.5x working pressure)
- Issue of the extraordinary inspection certificate
- Date of the next periodic inspection
Time: 1 day. The certificate is issued on the spot after a passed inspection. If the vehicle comes to us after a failed TDT inspection, tank welding with complete documentation is most often the key item cleared from the inspection report.
Contact
Silo trailer service department: +48 602 716 551 TDT department (Roland Sobota, MSc Eng): +48 504 788 385 E-mail: biuro@magnumchorula.pl · base in Chorula near Opole, Poland, 4 km from the A4 junction
Related
- Accident repair of silo trailers — pillar
- Frame straightening
- Axle replacement
- Paint renovation
- Tank crack repair
- Pressure vessel inspection
- TDT inspections of silo trailers
Related: Accident repairs (pillar) · Tank crack repair · Failed TDT — what next · TDT inspections of silo trailers