Mon–Fri 06:00–20:00  |  Sat 07:00–15:00 biuro@magnumchorula.pl

Kędzierzyn-Koźle

Silo trailer or truck breakdown near Kędzierzyn-Koźle? PHS Magnum reaches you in 30–40 minutes. ZCh Blachownia zone, A4 junction. Tel: +48 602 716 551.

DAF silo trailer hauling bulk materials

In Brief

Mobile service Kędzierzyn-Koźle — PHS Magnum in Chorula: 30 km, response time 30–40 minutes. Nearest authorised TDT silo trailer service for the ZCh Blachownia chemical complex and A4-adjacent industrial zone. Pneumatics, EBS, emergency welding. TDT inspection at Chorula: 2–5 working days. Tel: +48 602 716 551.


Kędzierzyn-Koźle is one of Poland’s key chemical and industrial hubs. The ZCh Blachownia chemical park and related facilities handle significant daily silo trailer traffic — granule deliveries and chemical compound transport. PHS Magnum in Chorula is the nearest fully TDT-authorised silo trailer service point for this area, and the only one in the region with ISO 9001:2015 certification and in-house pressure vessel welding qualifications.

Why Kędzierzyn-Koźle has heavy silo trailer traffic

The industrial zone around Kędzierzyn-Koźle is home to several large chemical producers:

  • ZAK Kędzierzyn — nitrogen fertilisers, ammonia, chemical compounds
  • Azoty Kędzierzyn — polyamide granules, caprolactam, fertilisers
  • Blachownia Chemical Park — plastics, chemical intermediates

These plants both send and receive material in bulk by silo trailer. Granule deliveries (PE, PP, PA) by bulk material haulage are a daily occurrence. A silo trailer breakdown at a plant gate or on the A4 exit to Kędzierzyn means immediate logistics disruption — fast on-site response is essential.

Response times

Location Distance Response time
Kędzierzyn-Koźle centre 30 km 30–40 min
ZCh Blachownia (A4 exit) 28 km 30–35 min
Strzelce Opolskie 20 km 25–30 min
Opole (further west on A4) 55 km 45–60 min

Note: for plant access at ZCh Blachownia and other secured sites, customers must pre-register our service vehicle with site security before our team arrives.

What we repair on-site

Silo trailer pneumatic system

The most common silo trailer breakdowns at industrial loading/unloading points involve the pneumatic discharge circuit:

  • Discharge and collective valves — Spitzer SF/SK series, Feldbinder, Kassbohrer. On-site valve replacement or emergency repair.
  • Aeration pads — cleaning to restore flow, or full pad replacement if fabric is torn or saturated.
  • Transfer hoses and Camlock couplings — replacement of damaged hoses, re-sealing of coupling faces.
  • Pressure safety valves — if valve has discharged due to line blockage, inspection and reset or replacement.

Brakes and EBS

  • EBS diagnostics (Wabco TEBS G2/G3) — fault code reading and clearing on-site
  • Spring brake actuator replacement — most common mechanical brake failure on silo trailers
  • Brake pad inspection and emergency replacement

Emergency welding

  • Aluminium MIG/TIG for Feldbinder and Kassbohrer aluminium tank frame cracks
  • Steel MIG/MAG for Spitzer steel frame repairs
  • Temporary structural repairs sufficient to move vehicle safely to workshop

Cab and tractor issues

  • Air suspension faults on the tractor unit (DAF, MAN, Scania, Volvo)
  • Electrical faults, trailer lighting
  • Tyre change on trailer axles (1–3)

Workshop at Chorula — full service 30 km away

On-site repair handles acute breakdowns. For anything requiring the workshop — TDT inspection, full pneumatic overhaul, sandblasting and repainting — the 30 km distance to Chorula keeps downtime to a minimum.

Service Lead time at Chorula
TDT inspection 2–5 working days
Full pneumatic overhaul 1–3 working days
Paint renovation (sandblasting + coating) 10–15 working days
Emergency welding repair 1–2 working days
Accident damage repair by assessment

Non-driveable vehicles can be transported to Chorula by flatbed (we can arrange). For vehicles that can drive, the A4 route is direct: Kędzierzyn-Koźle (Blachownia junction) → A4 east → Gogolin exit → 4 km to workshop.

Planned maintenance for Kędzierzyn-Koźle fleets

If your silo trailers regularly serve plants in the Kędzierzyn-Koźle area, consider a planned maintenance agreement with PHS Magnum. Benefits:

  • Reserved inspection slots — no waiting for urgent TDT or annual service
  • Combined TDT calendar for your whole fleet
  • Preferential response for mobile call-outs

Contact us to discuss: biuro@magnumchorula.pl

Contact — breakdown and service

Tel: +48 602 716 551 (daily 06:00–20:00)

biuro@magnumchorula.pl — enquiries and quote requests outside business hours.

Related: Mobile service overview · Silo trailer service · TDT inspection

Frequently Asked Questions

From Chorula to Kędzierzyn-Koźle is approximately 30 km — response time 30–40 minutes. This is one of our shortest call-out distances outside the Opole area.

Yes — we reach ZCh Blachownia, SAP, and other facilities in the economic zone. For plant access, the customer must pre-register our service vehicle with site security.

Pneumatic valves and aeration pads (silo trailers), EBS diagnostics (Wabco TEBS G2/G3), welding, hydraulics. For concrete pump breakdowns, site call-out is available by arrangement.

Yes. We arrange flatbed transport to Chorula (30 km) for non-driveable vehicles. Full repair and TDT inspection in our authorised workshop.

Contact & Hours

ul. Kościelna 9, 47-316 Chorula

Mon–Fri 06:00–20:00

Sat 07:00–15:00

+48 602 716 551 Contact us
DEKRA ISO 9001:2015 Quality Management Certificate — PHS Magnum

ISO 9001:2015

4 km from the A4 Motorway

180 km from German border

Call Email
Pogotowie Techniczne TIR & SILO +48 602 716 551