Mon–Fri 06:00–20:00  |  Sat 07:00–15:00 biuro@magnumchorula.pl
service PHS Magnum

Silo Trailer Renovation – When It Pays Off and What a Full Overhaul Covers

Silo trailer after full paint renovation at PHS Magnum – new paintwork and markings

In Brief

A new silo trailer costs €35,000–60,000. A full renovation (sandblasting, structural repair, epoxy primer, PUR 2K topcoat, refurbished fittings) costs several times less and restores the vehicle to near-new condition. Renovation makes sense when the tank structure is sound, axles have life remaining, and TDT re-certification is achievable. PHS Magnum completes full renovations in 7–14 working days.


A silo trailer after 10–12 years of operation looks like a worn-out tool: rusted chassis underside, cracked paintwork, faded markings, worn fittings. Every fleet manager and truck owner faces the same question: buy new or renovate the old one?

Numbers that speak for themselves

A new silo trailer from a reputable manufacturer (Spitzer, Feldbinder, Koegel) costs €35,000–60,000 today, depending on specification. Add VAT, financing costs and depreciation.

A full paint renovation at PHS Magnum covers:

  • sandblasting to bare metal (Sa 2.5 per ISO 8501),
  • anti-corrosion primer (epoxy + filler),
  • topcoat (PUR 2K polyurethane),
  • undercarriage painting,
  • new markings and reflective panels.

The result? The vehicle looks like new, at a fraction of the cost of a new trailer.

What else is worth doing during renovation?

While the trailer is stripped down and in the workshop, it is the ideal time for:

  • Fitting replacement — valves, pressure hoses, gauges and seals have a limited service life. Replacement cost is a fraction of a roadside breakdown.
  • Pneumatic system inspection and repair — leaks are the most common cause of unloading complaints.
  • Preparation for TDT inspection — if the inspection date is within a year, combine the renovation with a full technical check.
  • LED lighting upgrade — lower power consumption and better visibility.

How long does renovation take?

Standard completion time is 7–14 working days. Urgent cases (e.g. post-accident insurance requirement) can be expedited by prior arrangement.

Which trailers do we work on?

We service all major brands: Spitzer, Feldbinder, Kassbohrer, Koegel, Schmitz, Wielton. We have experience with both aluminium and steel trailers.

Location: Chorula near Opole, Poland – 4 km from the A4 motorway, 180 km from the German border. ISO 9001:2015 certified. Invoicing in EUR available.

Renovation enquiries: +48 602 716 551 | biuro@magnumchorula.pl

Related: Silo trailer service · Paint renovation · TDT inspections

Gallery

ISO 9001:2015

4 km from the A4 Motorway

180 km from German border

Call Email
Urgent? We call back within 2h +48 602 716 551